| Wednesday 9th August 2006 |
|
|
The Shop front is finished, certain signs still need to be put up.
|
The juice bar is nearly complete, the main menu boards aren’t yet in place.
|
|
|
The main reception desk and score monitor, signage for the counter still to be erected. The seating area can be seen to the right. You can also see Air Conditioning is in place.
|
A view looking down reception to the entrance. Plasma viewing screens on the wall to the left.
|
|
|
Here you can see the briefing room, the briefing video is still being made.
|
The Airlock is nearly finished the equipment has arrived, cupboards still to be built. |
|

|
The other side of the Airlock.
|
The Artwork in the arena is now complete, here is the raw matrix area. |
|
|
|
Here is the event horizon, the computerised castle is formed.
|
|
|
The Central castle area, ramps and raised platforms to ether side.
|
Another area of the castle. |
|

|
More Robots lurking around the arena!
|
| Sunday 23rd July 2006 |
|
|
The shop front has arrived, and a temporary sign banner is in place
|
Protective wrapping is still on the new front. To the left of the frontage you can see the serving hatch for the Smoothie bar.
|
|
|
The reception doors, suspended ceiling and flooring are now in place. The walls are ready to be painted.
|
Looking down the reception at the new shop front.
|
|
|
The ‘Fruit Fusion’ Smoothie bar will be located in this area. You will be able to purchase drinks both inside and outside of the centre.
|
The Airlock has had its first coat of paint. |
|

|
All the main structures are now up in the arena. All the walls have had there first coat of paint. Holes have started to be drilled in the ramps for blue upward shining LED’s.
|
It’s difficult to take photos of the arena at this stage as it is all black except for the floor. When the artist begins to theme and lighting is in place the arena will become more photographical. |
| Monday 10th July 2006 |
|
|
The Laser Fusion reception entrance, next to Pizza Hut with the Bowlplex to the right.
|
New shop front arriving on Monday.
|
|
|
The main reception area, the plastering has begun...
|
Looking down the reception you can now see the main wall dividing the arena and reception is now up.
|
|
|
The counter will be placed in-between the office and briefing room.
|
Looking towards the entrance. |
|

|
Entrance into the briefing room on the right.
|
To the right the toilet block, next to this on the left is one of the fire exit for the arena. Entrance to the briefing room and airlock to the left. |
|
|
Inside the airlock, looking towards the briefing room and reception.
|
Inside the airlock, looking towards the arena.
|
|
|
We can now see some of the area walls going up, view from raised platform to the right of arena.
|
The beginning of the raised platform that runs across the right had side wall. |
|
|
This area of the arena is still to be built.
|
The ramp to the left of the arena, now cladded. |
|
|
Currently unthemed scenery.
|
Ramp taking you to the raised platform. |
|
|
View looking from the ramp to the left of the arena. |
|
| Wednesday 5th July 2006 |
|
|
The main reception area, to the left is the office, the room behind is the briefing room.
|
The reception toilets are to the right, the Airlock is to the left.
|
|
|
Here is part of the arena that is still in shell form.
|
At the far end of the arena to the right the raised platform that runs the length of the wall.
|
|
|
At the far end of the arena to the left the corner ramp has started to take shape.
|
|
|
|